Daikin
Daikin 15 Ton 14 IEER Gas/Electric Packaged Rooftop Unit, 360,000 BTU Heat, R-32, 575V 3-Phase | DSG1807DM00001S
SKU: DSG1807DM00001S
$44,409.38- 🚚Qualifies for FREE Shipping
- ⚡Fast Shipping
Ships in 2-3 Business Days10 in stock -
Daikin
Daikin 15 Ton 14 IEER Gas/Electric Packaged Rooftop Unit, 400,000 BTU Heat, R-32, 575V 3-Phase | DSG1807DH00001S
SKU: DSG1807DH00001S
$44,859.47- 🚚Qualifies for FREE Shipping
- ⚡Fast Shipping
Ships in 2-3 Business Days10 in stock -
Tempstar
Tempstar 15 Ton 174,000 BTU Two-Stage Commercial Horizontal / Vertical Air Conditioner Package Unit, 208/230V 3-Phase, R-454B | RAF180H02A0AAA
SKU: RAF180H02A0AAA
$31,464.72- 🚚Qualifies for FREE Shipping
- ⚡Fast Shipping
Ships in 2-3 Business Days2 in stock -
Tempstar
Tempstar 15 Ton 174,000 BTU Commercial Horizontal / Vertical Air Conditioner Package Unit, 460V 3-Phase, R-454B | RAF180L02A0AAA
SKU: RAF180L02A0AAA
$31,887.23- 🚚Qualifies for FREE Shipping
- ⚡Fast Shipping
Ships in 2-3 Business DaysOnly 1 in stock
15 Ton Rooftop Units
15-Ton Rooftop Units: What Changes When You Move Into the Large Cabinet
A 15-ton rooftop unit is nominally 180,000 Btu/h of cooling, and on this site it marks the move into large-cabinet packaged equipment. Listed weights in this category run from about 1,740 lb to just over 2,040 lb, compared with roughly 1,000 to 1,300 lb at 12.5 tons. The gas heat inputs step up, the curb gets bigger, the crane gets bigger, and the electrical circuit gets heavier. If you are pricing a 15-ton job the same way you price a 10-ton change-out, this page is meant to catch what is different.
The selection here is Daikin's R-32 standard-efficiency line (DSG gas/electric and DSC cooling only), Rheem's R-454B large-cabinet units (RGEGYB gas/electric and RACGYB cooling only), and Daikin DFG R-410A gas/electric listings.
Where 15-Ton Units Are Used
Fifteen-ton units are common on larger single zones and on buildings divided into a few big zones: supermarket and big-box sales floors, school gymnasiums and cafeterias, worship spaces, manufacturing offices with a production area, call centers and larger restaurants. Some designers use one 15-ton unit where an older building had two smaller units, or the reverse when redundancy matters. Any rule of thumb for square footage at this size is a rough check only; occupancy, ventilation and process loads drive the real number, so size from a commercial load calculation.
Capacity and Efficiency
The current-production units here list about 172,000 Btu/h of cooling capacity, and the Daikin DFG lists 180,000 Btu/h. Efficiency on this page is grouped tightly:
- Daikin DSC cooling only: 14.2 IEER, 11 EER.
- Daikin DSG gas/electric: 14 IEER, 10 EER.
- Rheem RGEGYB gas/electric: 14 IEER, 10 EER.
- Rheem RACGYB cooling only: listed as a Renaissance Classic unit at 11.0 EER, with 14 IEER in its specifications.
- Daikin DFG gas/electric: 14 IEER.
Because the ratings are this close, the comparison at 15 tons often comes down to heat input, voltage, blower configuration, weight, curb fit and availability rather than efficiency. As always, verify the AHRI-certified rating for the exact model and options if the project has a code or incentive requirement.
Gas Heat Inputs Step Up
At this size the gas sections are substantially larger. The Daikin DSG listings are offered at 260,000, 360,000 and 400,000 Btu/h input, and the Rheem RGEGYB listings show 320,000 Btu/h input. Larger heat inputs bring practical consequences: the gas supply line and meter must be sized for the full input along with any other gas loads in the building, and the inlet pressure at the unit must stay within the range the manufacturer specifies while all appliances are firing. Check the temperature rise range on the product page against your design airflow, and make sure flue discharge clearances to fresh-air intakes, parapets and property lines meet the installation manual and local code.
There is no packaged heat pump or high-efficiency Daikin DHG or DHC listed at 15 tons in this category. For all-electric heating, look at cooling-only units with electric heat accessories after confirming the electrical service, or consider multiple smaller heat pumps from the 7.5 Ton or 10 Ton Rooftop Units pages.
Electrical: Why 460V Matters More Here
All units are three-phase. Daikin DSG, DSC and DFG are listed in 208/230V, 460V and 575V. Rheem RGEGYB and RACGYB are listed in 208/230V and 460V. At 15 tons, a 208/230V unit draws enough current that the conductor, disconnect and breaker sizes become a meaningful part of the job cost. Where the building has 480V distribution, a 460V unit usually simplifies the circuit. Use the MCA and MOP on each product listing to size it, and confirm measured voltage and phase balance at the disconnect before startup, because voltage imbalance hits large three-phase motors hard.
Two Compressors and Part-Load Operation
The Daikin 15-ton listings show two compressors, giving two stages of cooling. The Rheem RACGYB listings show two compressors and two-stage operation, and the Rheem units list a belt-drive blower with a VFD. Two-step capacity is valuable at this size, since a large single zone spends most of its hours at part load. For assembly spaces and others with variable occupancy, discuss demand-controlled ventilation and the blower control sequence with the engineer so the unit is not conditioning far more outside air than the occupancy calls for.
Rigging and Structural Planning
With units weighing roughly 1,700 to 2,000 lb or more, rigging becomes its own line item:
- Get the crane company the exact weight, cabinet dimensions and pick distance from the product page and installation manual.
- Use spreader bars and the manufacturer's designated lifting points so the cabinet is not crushed or racked.
- Have a structural engineer check the roof framing if the new unit is heavier than the old one or sits in a new location.
- Plan street closures, permits and site access for the crane if the building is in a dense area.
- Stage the curb, economizer, gas connection parts and electrical disconnect so everything is ready on lift day.
Curb and Duct Transitions
Large-cabinet curbs are expensive and heavy, and replacement jobs often involve a different footprint than the original unit. Measure the existing curb and duct openings carefully. A manufacturer-approved adapter curb can save rebuilding roof penetrations, but it raises the unit and may require changes to gas, condensate and electrical routing. Confirm whether the new unit is configured for downflow or horizontal discharge to match the existing ductwork before you order.
Refrigerant and Code Notes
Daikin DSG and DSC use R-32, and Rheem RGEGYB and RACGYB use R-454B. Both are A2L refrigerants; technicians need A2L-rated tools and training, and the installation must follow the manufacturer's instructions and the adopted mechanical code. Larger refrigerant charges can carry additional requirements, so read the installation manual's A2L section for leak detection and mitigation wiring. The Daikin DFG listings use R-410A; new R-410A packaged equipment is no longer being manufactured for this application, so confirm availability and project acceptance before ordering.
Economizer requirements, economizer fault detection and ventilation rates at this capacity are set by your climate zone and the adopted edition of ASHRAE 90.1 or IECC. Confirm with the engineer of record, then order the economizer and relief option made for that cabinet.
Ordering at 15 Tons
Large-cabinet units, especially 460V, 575V and high-heat versions, may not be stocked as deeply as smaller sizes. Confirm availability and lead time before you commit to a crane date or a tenant opening. Order curbs early, since a curb often needs to be set and flashed before the unit arrives.
15-Ton Models in This Category
| Brand | Series | Type | Voltages Listed | Efficiency (as listed) |
|---|---|---|---|---|
| Daikin | DSC | Cooling only, R-32 | 208/230V-3, 460V-3, 575V-3 | 14.2 IEER, 11 EER |
| Daikin | DSG | Gas/electric, R-32, 260,000 to 400,000 Btu/h input | 208/230V-3, 460V-3, 575V-3 | 14 IEER, 10 EER |
| Daikin | DFG | Gas/electric, R-410A | 208/230V-3, 460V-3, 575V-3 | 14 IEER |
| Rheem | RGEGYB | Gas/electric, R-454B, 320,000 Btu/h input, belt drive VFD | 208/230V-3, 460V-3 | 14 IEER, 10 EER |
| Rheem | RACGYB (Renaissance Classic) | Cooling only, R-454B, belt drive VFD | 208/230V-3, 460V-3 | 11.0 EER, 14 IEER |
Figures are from each product listing. Confirm against the manufacturer's spec sheet or AHRI certificate for the exact model number.
Frequently Asked Questions
How much does a 15-ton rooftop unit weigh?
Listed weights on this page run from about 1,740 lb for the Daikin DSC to just over 2,040 lb for the Rheem RGEGYB. Use the exact model's listed weight for crane planning and structural review.
What gas heat inputs are available at 15 tons?
Daikin DSG is listed at 260,000, 360,000 and 400,000 Btu/h input. Rheem RGEGYB is listed at 320,000 Btu/h input. Size the gas line for the full input plus other building loads.
Is there a high-efficiency or heat pump option at 15 tons?
Not in this category. The Daikin DHG, DHC and DSH series appear at smaller sizes on this site. At 15 tons the listed options are gas/electric and cooling only.
Can a 15-ton unit go on the curb from my old 15-ton unit?
Only if the footprint and duct openings match, which is unlikely across brands or generations. Plan for an adapter curb or new curb and confirm dimensions before ordering.
Do these units have two compressors?
The Daikin and Rheem RACGYB listings at this size show two compressors, giving two stages of cooling capacity. Check the exact model's specifications to confirm.
Should I choose 208/230V or 460V?
If the building has 480V service, 460V usually means lower current and smaller conductors. If it only has 208V, use the 208/230V model and confirm voltage at the disconnect is within the unit's rated range.